Latest info on runway closures according to the NOTAMs:
Runway 18C-36C (Zwanenburgbaan): closed from 12 May 07.00h until 19 May 18.00h Local Time
Taxiway Q closed 11 May 07.00h until 22 May 22.00h Local Time
Runway 18C-36C (Zwanenburgbaan): closed from 12 May 07.00h until 19 May 18.00h Local Time
Taxiway Q closed 11 May 07.00h until 22 May 22.00h Local Time
Last edited by EHAM on 18 May 2020, 19:17, edited 1 time in total.
- EHAM
- Scramble Master
- Posts: 3415
- Joined: 30 Apr 2005, 21:32
- Type of spotter: F2
- Subscriber Scramble: Joost de Wit
- Location: Hoofddorp
- Contact:
Re: Abbreviations, info, parkingspots and runway info
Latest info on upcoming runway closures according to the NOTAMs:
Runway 09-27 (Buitenveldertbaan): closed from 22 May 07.00h till 29 June 08.00h Local Time.
Runway 18L-36R (Aalsmeerbaan): closed until 6 July
Runway 04-22 (Oostbaan) fully operational
Runway 09-27 (Buitenveldertbaan): closed from 22 May 07.00h till 29 June 08.00h Local Time.
Runway 18L-36R (Aalsmeerbaan): closed until 6 July
Runway 04-22 (Oostbaan) fully operational
Last edited by EHAM on 28 Jun 2020, 16:12, edited 2 times in total.
Re: Abbreviations, info, parkingspots and runway info
Wanneer gaat de G-pier weer open voor verkeer? En Aalsmeerbaan was dicht t/m 1 juni, tot wanneer is dit verlengd?
Gr,
Dimitri
Gr,
Dimitri
-
- Scramble Senior
- Posts: 466
- Joined: 17 Nov 2004, 23:05
- Location: EBBR
Re: Abbreviations, info, parkingspots and runway info
36R/18L nog dicht tot 31/08/2020 om 16:00 lokaal volgens NOTAM.Dutchman wrote:Wanneer gaat de G-pier weer open voor verkeer? En Aalsmeerbaan was dicht t/m 1 juni, tot wanneer is dit verlengd?
Re: Abbreviations, info, parkingspots and runway info
Vanaf 6 juli kan de 36R/18L weer gebruikt worden.Robin_Bamps wrote:36R/18L nog dicht tot 31/08/2020 om 16:00 lokaal volgens NOTAM.Dutchman wrote:Wanneer gaat de G-pier weer open voor verkeer? En Aalsmeerbaan was dicht t/m 1 juni, tot wanneer is dit verlengd?
In thrust, we trust
Re: Abbreviations, info, parkingspots and runway info
verwacht de 18C/36C ook maar regelmatig U/S tot einde van het jaar vanwege werkzaamheden op en rondom de nieuwe rijbaan Q.
nog niks officieel over bekend over de exacte dagen/weken voor zover bij mij bekend.
nog niks officieel over bekend over de exacte dagen/weken voor zover bij mij bekend.
- EHAM
- Scramble Master
- Posts: 3415
- Joined: 30 Apr 2005, 21:32
- Type of spotter: F2
- Subscriber Scramble: Joost de Wit
- Location: Hoofddorp
- Contact:
Re: Abbreviations, info, parkingspots and runway info
Some upcoming closures:
Runway 18C-36C (Zwanenburgbaan): from 17 August 07.00h LT till 28 August 16.00h LT
Runway 18R-36L (Polderbaan): from 31 August 07.00h LT till 05 September 12.00h LT
Source: Bezoekbas
Runway 18C-36C (Zwanenburgbaan): from 17 August 07.00h LT till 28 August 16.00h LT
Runway 18R-36L (Polderbaan): from 31 August 07.00h LT till 05 September 12.00h LT
Source: Bezoekbas
- EHAM
- Scramble Master
- Posts: 3415
- Joined: 30 Apr 2005, 21:32
- Type of spotter: F2
- Subscriber Scramble: Joost de Wit
- Location: Hoofddorp
- Contact:
Re: Abbreviations, info, parkingspots and runway info
Some upcoming closures:
Runway 06-24 (Kaagbaan): closed from 21 September 07.00h LT till 26 September 18.00h LT
Runway 18C-36C (Zwanenburgbaan): from 28 September 07.00h LT till 16 October 18.00h LT: due to construction works on taxiways on the southside of the runway, runway 18C-36C will not be used during peak hours (i.e. if 18R-36L Polderbaan is also in use). Instead, runway 09-27 (Buitenveldertbaan) will be used during peak hours.
Runway 18L-36R (Aalsmeerbaan): closed from 2 November 07.00h LT till 7 November 19.00h LT
Runway 18C-36C (Zwanenburgbaan): closed from 23 November 08.30h LT till 25 November 16.30h LT
Source: Bezoekbas / notams / Schiphol.nl
Runway 06-24 (Kaagbaan): closed from 21 September 07.00h LT till 26 September 18.00h LT
Runway 18C-36C (Zwanenburgbaan): from 28 September 07.00h LT till 16 October 18.00h LT: due to construction works on taxiways on the southside of the runway, runway 18C-36C will not be used during peak hours (i.e. if 18R-36L Polderbaan is also in use). Instead, runway 09-27 (Buitenveldertbaan) will be used during peak hours.
Runway 18L-36R (Aalsmeerbaan): closed from 2 November 07.00h LT till 7 November 19.00h LT
Runway 18C-36C (Zwanenburgbaan): closed from 23 November 08.30h LT till 25 November 16.30h LT
Source: Bezoekbas / notams / Schiphol.nl
Last edited by EHAM on 29 Oct 2020, 10:27, edited 1 time in total.
- EHAM
- Scramble Master
- Posts: 3415
- Joined: 30 Apr 2005, 21:32
- Type of spotter: F2
- Subscriber Scramble: Joost de Wit
- Location: Hoofddorp
- Contact:
Re: Abbreviations, info, parkingspots and runway info
Some news regarding runway maintenance for next year already:
Runway 18C-36C (Zwanenburgbaan): from 23 November 2020 till mid-May 2021: due to construction works on taxiways on the southside of the runway, runway usage will be restricted.
Runway 18R-36L (Polderbaan): closed from 25 January till 26 April
Source: Schiphol.nl
Runway 18C-36C (Zwanenburgbaan): from 23 November 2020 till mid-May 2021: due to construction works on taxiways on the southside of the runway, runway usage will be restricted.
Runway 18R-36L (Polderbaan): closed from 25 January till 26 April
Source: Schiphol.nl
- EHAM
- Scramble Master
- Posts: 3415
- Joined: 30 Apr 2005, 21:32
- Type of spotter: F2
- Subscriber Scramble: Joost de Wit
- Location: Hoofddorp
- Contact:
Re: Abbreviations, info, parkingspots and runway info
Planning baanonderhoud 2021: https://bezoekbas.nl/nieuws/baanonderho ... l-in-2021/
- EHAM
- Scramble Master
- Posts: 3415
- Joined: 30 Apr 2005, 21:32
- Type of spotter: F2
- Subscriber Scramble: Joost de Wit
- Location: Hoofddorp
- Contact:
Re: Abbreviations, info, parkingspots and runway info
Runway 18R-36L (Polderbaan) closed from Monday 18 January 07.00h Local Time till Wednesday 20 January 09.30h Local Time.
- rayadam
- Scramble Die-Hard
- Posts: 616
- Joined: 27 Mar 2011, 22:48
- Type of spotter: Nummers
- Subscriber Scramble: Ja
- Location: Noorden
- Contact:
Re: Abbreviations, info, parkingspots and runway info
Van 25 januari tot 26 april is de Polderbaan gesloten. Ends: 26/04/2021 / 08:30LT UTC
En daarna gaat 18C/36C, tot 01/06/2021
26/04/2021 11:00LT / 16/05/2021 21:00LT UTC
TWY Z CLSD BTN TWY W5 AND ENTRY W11, TWY B CLSD BTN TWY Z AND TWY A25, ENTRY'S W9, W10 AND W12 RWY 18C/36C CLSD, ILS 18R U/S, ILS 18C CAT I ONLY
16/05/2021 21:00LT / 01/06/2021 17:00LT UTC
RWY 18C/36C CLSD, TWY Z CLSD, TWY B CLSD BTN TWY Z AND TWY A24, ILS 18R CAT I ONLY
Source: https://ext.eurocontrol.int/airport_corner_public/EHAM
En daarna gaat 18C/36C, tot 01/06/2021
26/04/2021 11:00LT / 16/05/2021 21:00LT UTC
TWY Z CLSD BTN TWY W5 AND ENTRY W11, TWY B CLSD BTN TWY Z AND TWY A25, ENTRY'S W9, W10 AND W12 RWY 18C/36C CLSD, ILS 18R U/S, ILS 18C CAT I ONLY
16/05/2021 21:00LT / 01/06/2021 17:00LT UTC
RWY 18C/36C CLSD, TWY Z CLSD, TWY B CLSD BTN TWY Z AND TWY A24, ILS 18R CAT I ONLY
Source: https://ext.eurocontrol.int/airport_corner_public/EHAM
Re: Abbreviations, info, parkingspots and runway info
Re-opening postponed till 10-5-2021,due to the snowy conditions, last month.
According "Luchtvaart nieuws"
Rgds,Martin.
- EHAM
- Scramble Master
- Posts: 3415
- Joined: 30 Apr 2005, 21:32
- Type of spotter: F2
- Subscriber Scramble: Joost de Wit
- Location: Hoofddorp
- Contact:
Re: Abbreviations, info, parkingspots and runway info
Not only that; maintenance for other runways has also been rescheduled. New planning:
25 January – 10 May: Polderbaan (18R/36L) closed
31 May – 21 June: Zwanenburgbaan (18C/36C) closed
12–23 July: Schiphol-Oostbaan (04/22) closed
6–20 September: Buitenveldertbaan (09/27) closed
27 September – 10 October: Aalsmeerbaan (18L/36R) closed
11-17 October: Kaagbaan (06/24) closed
Source: Bezoekbas
25 January – 10 May: Polderbaan (18R/36L) closed
31 May – 21 June: Zwanenburgbaan (18C/36C) closed
12–23 July: Schiphol-Oostbaan (04/22) closed
6–20 September: Buitenveldertbaan (09/27) closed
27 September – 10 October: Aalsmeerbaan (18L/36R) closed
11-17 October: Kaagbaan (06/24) closed
Source: Bezoekbas
Last edited by EHAM on 09 Jul 2021, 21:16, edited 1 time in total.
- EHAM
- Scramble Master
- Posts: 3415
- Joined: 30 Apr 2005, 21:32
- Type of spotter: F2
- Subscriber Scramble: Joost de Wit
- Location: Hoofddorp
- Contact:
Re: Abbreviations, info, parkingspots and runway info
Between 10 and 14 May the Polderbaan (18R/36L) will only be available for departures; not for landings.
More detailed info here: https://bezoekbas.nl/nieuws/meetvluchte ... -mei-2021/