F-35 Lightning II developments
Forum rules
- Starfighter_F-104G
- Scramble Addict
- Posts: 1271
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
Italy F-35A
AL01/03 LRIP VI
AL04/06 LRIP VII
AL07/08 LRIP VIII
AL09 LRIP IX
AL10 LRIP X
AL11/12 LRIP XI
AL13/14 Lot 12
AL15/17 Lot 13
AL18/22 Lot 14
Italy F-35B
BL01 LRIP IX It.Navy
BL02 LRIP X It.Navy
BL03 LRIP XI ITAF
BL04 Lot 12 planned It.Navy
BL05 Lot 13 planned ITAF
BL06 Lot 14 planned It.Navy
AL01/03 LRIP VI
AL04/06 LRIP VII
AL07/08 LRIP VIII
AL09 LRIP IX
AL10 LRIP X
AL11/12 LRIP XI
AL13/14 Lot 12
AL15/17 Lot 13
AL18/22 Lot 14
Italy F-35B
BL01 LRIP IX It.Navy
BL02 LRIP X It.Navy
BL03 LRIP XI ITAF
BL04 Lot 12 planned It.Navy
BL05 Lot 13 planned ITAF
BL06 Lot 14 planned It.Navy
Re: F-35 Lightning II developments
Yes there were. Basic Lot 11 were 22 B's (BF-71 till BF-92 (169607 till 169628)) and then 2 additional aid package (BF-93/94 (169678/169679)).Melchior Timmers wrote:Ok, so there were no FY2017 LRIP 11 Congressional Aid Package B's?Bjorn wrote: No, the first B of Lot 12 was 169680 (BF-95).
169702 wasn't the first C of Lot 11 either, that was 169631 (CF-36). It was the first of the additional 4 added to Lot 11.
Greets,
Greets,
Bjorn Claes
F-16.net editor/photo library admin/serials database admin
F-16.net editor/photo library admin/serials database admin
- Starfighter_F-104G
- Scramble Addict
- Posts: 1271
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
F-012 F-35A KLU f.f. 18-06-2020
Re: F-35 Lightning II developments
Correct, callsign was Lightning12. Heard him switching Cameri tower on return after his test flight.
Re: F-35 Lightning II developments
Noted AF-246 (18-5355/AK "355 FS") and BF-101 (169686) Friday, June 19, 2020.
Both flew with a Lightning callsign used during company test flights. I have not seen these prior so could have been first flights.
Tally.
Both flew with a Lightning callsign used during company test flights. I have not seen these prior so could have been first flights.
Tally.
Re: F-35 Lightning II developments
Zesty 51/3 delivering to Eielson June 25, 2020. Not sure which 35's those are as I am not present but assumed to be AF-241-242-243.
Tanker support is Adobe 02. A KC-135R, 62-3526 per ADSB, that left Offutt this morning.
Tally.
Tanker support is Adobe 02. A KC-135R, 62-3526 per ADSB, that left Offutt this morning.
Tally.
- Starfighter_F-104G
- Scramble Addict
- Posts: 1271
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
Contracts For June 29, 2020
NAVY
Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $360,800,000 not-to-exceed undefinitized contract modification (P00038) to previously awarded fixed-price-incentive-firm-target contract N00019-17-C-0001. This modification provides for the procurement of four F-35C Carrier Variant Lot 14 aircraft for the Navy.
Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $67,690,000 not-to-exceed modification (P00004) to previously awarded fixed-price-incentive-firm-target advance acquisition contract N00019-20-C-0009. This modification procures long lead materials, parts, components and support necessary to maintain on-time production and delivery of nine lot 16 F-35A Lightning II aircraft for the government of The Netherlands, as well as seven F-35A semiconductors and two F-35B Lightning II aircraft for the government of Italy.
NAVY
Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $360,800,000 not-to-exceed undefinitized contract modification (P00038) to previously awarded fixed-price-incentive-firm-target contract N00019-17-C-0001. This modification provides for the procurement of four F-35C Carrier Variant Lot 14 aircraft for the Navy.
Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $67,690,000 not-to-exceed modification (P00004) to previously awarded fixed-price-incentive-firm-target advance acquisition contract N00019-20-C-0009. This modification procures long lead materials, parts, components and support necessary to maintain on-time production and delivery of nine lot 16 F-35A Lightning II aircraft for the government of The Netherlands, as well as seven F-35A semiconductors and two F-35B Lightning II aircraft for the government of Italy.
- Starfighter_F-104G
- Scramble Addict
- Posts: 1271
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
confirmed your AF241/243tally wrote:Zesty 51/3 delivering to Eielson June 25, 2020. Not sure which 35's those are as I am not present but assumed to be AF-241-242-243.
Tanker support is Adobe 02. A KC-135R, 62-3526 per ADSB, that left Offutt this morning.
Tally.
18-5350
18-5351
18-5352
Last edited by Starfighter_F-104G on 03 Jul 2020, 15:35, edited 1 time in total.
Re: F-35 Lightning II developments
Noted today at NAS Fort Worth.
AU-28, A35-028 (FMS 18-5399).
AF-246, 18-5356/AK “356 FS”. First flight?
Tally.
AU-28, A35-028 (FMS 18-5399).
AF-246, 18-5356/AK “356 FS”. First flight?
Tally.
Last edited by tally on 02 Jul 2020, 02:58, edited 1 time in total.
- Starfighter_F-104G
- Scramble Addict
- Posts: 1271
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
Contracts For July 1, 2020
CORRECTION: The June 29, 2020,
announcement of a contract modification (P00004) to Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas (N00019-20-C-0009), for $67,690,000 included incorrect procurement information. This modification is for the procurement of long lead materials, parts, components and support necessary to maintain on-time production and delivery of nine Lot 16 F-35A Lightning II aircraft for the government of The Netherlands, as well as seven F-35A Lightning II and two F-35B Lightning II aircraft for the government of Italy.
CORRECTION: The June 29, 2020,
announcement of a contract modification (P00004) to Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas (N00019-20-C-0009), for $67,690,000 included incorrect procurement information. This modification is for the procurement of long lead materials, parts, components and support necessary to maintain on-time production and delivery of nine Lot 16 F-35A Lightning II aircraft for the government of The Netherlands, as well as seven F-35A Lightning II and two F-35B Lightning II aircraft for the government of Italy.
Re: F-35 Lightning II developments
Delivery of four IAF F-35i's (AS15,AS22,AS23,AS24) to Nevatim AFB via Lajes schedule for today or tomorrow.
Any news about it?
Any news about it?
Re: F-35 Lightning II developments
KNFW is closed July 3rd due to the July 4th holiday. Have not heard anything leave but when they do its typically early in the morning. So they could be on the way.gluefan1 wrote:Delivery of four IAF F-35i's (AS15,AS22,AS23,AS24) to Nevatim AFB via Lajes schedule for today or tomorrow.
Any news about it?
Tally
-
- Scramble Senior
- Posts: 404
- Joined: 10 Sep 2002, 20:15
- Type of spotter: military spotting
- Location: Aviano, Italy
Re: F-35 Lightning II developments
Starfighter_F-104G wrote:confirmed your AF241/243tally wrote:Zesty 51/3 delivering to Eielson June 25, 2020. Not sure which 35's those are as I am not present but assumed to be AF-241-242-243.
Tanker support is Adobe 02. A KC-135R, 62-3526 per ADSB, that left Offutt this morning.
Tally.
18-5351
18-5352
18-5353
aren't AF241/243 18-5350/52? and 18-5353 was reported as WA on June 15th
- Starfighter_F-104G
- Scramble Addict
- Posts: 1271
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
Maurizio wrote:
aren't AF241/243 18-5350/52? and 18-5353 was reported as WA on June 15th
CORRECTED , tks
Re: F-35 Lightning II developments
AF-248, 18-5357/WA “57 FW” as Lightning 31, First flight, July 8, 2020.
Tally.
Tally.
Last edited by tally on 10 Jul 2020, 05:08, edited 1 time in total.