Sweden may buy 40-60 Saab 39E Gripen NGs after Swiss order..

ImageForum for news and discussions on miltary aviation matters.

Forum rules
Image
Post Reply
User avatar
Stratofreighter
Scramble Master
Scramble Master
Posts: 22192
Joined: 25 Jan 2006, 08:02
Location: Netherlands

Sweden may buy 40-60 Saab 39E Gripen NGs after Swiss order..

Post by Stratofreighter »

http://www.defensenews.com/article/2012 ... |FRONTPAGE

Some excerpts below.
Switzerland-Sweden Joint Gripen Purchase to Move Forward

The deal forms part of a larger order for Gripens to be shared with Sweden, which Stockholm said would help to keep costs down.

The Gripens, which would replace the Swiss Air Force’s aging U.S.-built F-5 Tigers, are of a more advanced model still under development and will not be available before 2018, according to Bern.

For its part the Swedish government plans to buy 40 to 60 new Gripens over the next decade at a cost of 2 billion kronor (242 million euros).
Excerpts above taken from http://www.defensenews.com/article/2012 ... |FRONTPAGE
------------------------------------------------------------------------------------------
http://www.thelocal.se/42822/20120825/
Sweden to buy Super-Jas fighter jets

Published: 25 Aug 12 11:55 CET

The Swedish government has promised that Sweden is to buy 40-60 units of the next generation of fighter jet Jas Gripen,
and is therefore increasing the Swedish Armed Forces’ budget.

The Armed Forces (Försvarsmakten) will be receiving 300 million kronor ($45.5 million) extra in 2013 and 2014, and 200 million kronor extra annually after that,
wrote the leaders of Sweden’s four centre-right governing parties in an opinion piece in the Svenska Dagbladet newspaper (SvD).

The party leaders wrote that Sweden and Switzerland, in need of 22 aircraft, have teamed up to buy the Jas Gripen E/F, or Super-Jas.

According to the government, the new system will be up and running in Sweden from 2023 and at least 20 years after that.

The party leaders wrote that this partnership with Switzerland makes the system more cost efficient.
The alternative, buying foreign aircraft, has been analyzed, but the new generation of Jas Gripen has been deemed more efficient for several reasons, they claimed.

The Social Democrats have said previously that a deal with another country is a prerequisite for discussing upgrading Jas Gripen.
Excerpts taken from http://www.thelocal.se/42822/20120825/
November 2024 update at FokkerNews.nl....
User avatar
Stratofreighter
Scramble Master
Scramble Master
Posts: 22192
Joined: 25 Jan 2006, 08:02
Location: Netherlands

Re: Sweden may buy 40-60 Saab 39E Gripen NGs after Swiss ord

Post by Stratofreighter »

http://www.defense-aerospace.com/articl ... hters.html
Military Needs At Least 60 New Fighter Jets

(Source: Radio Sweden; published Nov. 8, 2012)

Sweden needs at least 60 Gripen combat aircraft in the future, the Swedish Armed Forces Supreme Commander Sverker Göransson, told a parliamentary hearing today.

"Sweden needs 60-80 fighter aircraft to meet the technical and operational threat scenario, "says Armed Forces Supreme Commander Sverker Goranson.

The government has asked for a parliamentary mandate to buy 40-60 planes.

The armed forces could not provide details of what initiatives are needed and what they would cost if the number of Super-Jas,
the so-called E-model of the JAS 39 Gripen, was to reach 60.

The first Super-Jas plane made by Saab aerospace is expected to be operational from 2023 and will be used until 2042.

Defence Ministry State Secretary Carl von der Esch said that the total annual cost for the system is estimated at SEK3 billion starting from next year, ie a total of SEK 90 billion.

Parliament will decide in December whether to allow the Government to order between 40-60 planes.

-ends-
November 2024 update at FokkerNews.nl....
User avatar
Stratofreighter
Scramble Master
Scramble Master
Posts: 22192
Joined: 25 Jan 2006, 08:02
Location: Netherlands

Re: Sweden may buy 40-60 Saab 39E Gripen NGs after Swiss ord

Post by Stratofreighter »

http://www.defensenews.com/article/2012 ... |FRONTPAGE
Sweden’s Possible Gripen Cut Prompts Force Capability Fears

Nov. 19, 2012 - 01:20PM

HELSINKI — The Swedish government reportedly may scale back its purchase of Saab-built combat aircraft to as few as 40, raising fears over the future capability of its Air Force.

One party spokesman also worries that fewer purchases will put Sweden on the path to have a smaller Air Force than Norway.

Doubts over the size of the state’s order is further complicated by the lack of certainty over the sale of the aircraft to Switzerland.

Sweden has made clear it will cancel funding for the program if the Swiss deal fails to navigate a series of hurdles.

In Sweden, the concern is that Swedish Prime Minister Fredrik Reinfeldt’s center-right administration might bow to rising national debt pressures and reduce the buy of JAS Gripen-NG E/F aircraft.

“The government had initially favored acquiring 80 to 100 fighters.

This was reduced to between 60 to 80 units last spring.

Now it is talking of purchasing 40 to 60 aircraft,” said Staffan Danielsson, a member of Parliament with the ruling Center Party, who sits on the national Parliamentary Defense Committee.

“The order should not fall below 60. Even at this level, the Air Force’s capability will be more limited,” he told Defense News.

The government, which has largely abandoned its status as the regional defense leader, a position that hinged on an Air Force with up to 150 front-line fighters,
is expected to outline its next-generation (NG) aircraft acquisition plans to Parliament by mid-December.

If the government reduces its Gripen order, Sweden could weaken its front-line fighter capability and threaten its ability to provide a credible national and regional deterrent to attack, Danielsson said.

In 2004, the Air Force had more than 200 Gripen combat aircraft in the A/B and C/D variety.
The number dwindled to 100 C/D aircraft after 2008.

The government is now proposing to reorganize Sweden’s air-defense structure to just one fighter type, the Gripen E/F, phasing out the remaining Gripen A/B and C/D types due to cost.

“While cost is always a factor in play, the military would benefit from having E/F and C/D systems operate in parallel to each other in the transition period until the Air Force has a full complement of next-generation fighters in service. I do not see why this cannot happen,” Danielsson said.

However, Maj. Gen. Micael Bydén, the Swedish Air Force’s chief of staff, has dismissed the notion of operating two modern fighter systems concurrently.

“It would not be feasible to operate two separate systems in the current economic climate. It just would not fit, in terms of affordability, to run two systems,” Bydén said in a statement.

The government’s reluctance to meet the Armed Forces Command’s (AFC’s) request to boost defense spending after 2013 provoked defense chief Gen. Sverker Göranson, in July,
to warn that the military would be “forced to mothball large parts of the Army, Navy and Air Force.”

The AFC would like the budget set at an annual level of $6.5 billion to $6.7 billion. At this level, it could avoid cuts in areas such as exercises, pilot training, routine air surveillance, and participation in international missions and recruitment.

The command raised its defense funding and fighter acquisition concerns during a public hearing on military projects and financing convened by the Riksdag on Nov. 8. Göranson attended the meeting.

“Sweden needs a minimum of 60 to 80 fighter aircraft to meet the needs of the assessed technical and operational threat we face.
That number should preferably be 80,” Göranson said at the meeting.

Moreover, the defense chief provided cost estimates for maintaining the existing fleet of 100 Gripen C/Ds, and an alternate estimate that covered the probable cost of purchasing a foreign-produced fighter.

According to AFC estimates, the Air Force would require $8.9 billion to maintain and upgrade its existing C/D fleet between 2022 and 2042.

The cost of procuring 40 to 60 foreign-produced multirole combat aircraft was estimated at $16.3 billion. This estimate includes the flyaway cost, logistics, training and weapon systems.

“What materialized very clearly from the public meeting is that the government’s proposed financing of the fighter acquisition project is inadequate.
This project needs to be funded properly.

Talk of international partnerships to develop the E/F Gripen is nice, but without real orders, it’s just a distraction right now,”
Fredrik Olovsson, the opposition Social Democrat’s group leader on the Parliamentary Finance Committee, told Defense News.

Saab’s preliminary costs submitted to the government suggest the company can deliver a Gripen E/F at roughly $80 million per jet.

Moreover, the government puts the total cost of acquiring 40 to 60 aircraft, including development and lifecycle costs, at $13.5 billion.
The Air Force expects to take delivery of the first Gripen E/F aircraft in 2023, with the fighter expected to stay in service until 2043.

Swiss Partnership Shaky

Saab’s figures for serial production are based on receiving a final order for 22 E/F fighters from Switzerland. Sweden in August guaranteed delivery for a fixed cost of $3.25 billion.

The fragility of the Swiss order was apparent on Nov. 14, when Swiss Defense Minister Ueli Maurer said he was unsure if Parliament would approve a financing package for the Gripen E/F purchase.

“It will be difficult, but we remain hopeful it can be approved.
It will be a lot harder if the final decision is decided by referendum. We could face tough opposition,” Maurer said in a statement.

For its part, Saab claims it can turn a profit on the Gripen-NG project if orders exceed 60 jets.

“We have presented the Swedish government with a tender and are actively discussing a future order of Gripen-NG.
At the same time, global interest in Gripen remains high,” said Saab CEO Håkan Buskhe.

Parties became concerned in September when the Swedish government revealed that it had included an exit clause in its 2013 budget,
allowing it to pull out of the Gripen-NG project if the Swiss sale collapses and no other international partner can be found.

Defense Minister Karin Enström defends the Swedish government’s track record on defense spending, pointing to a plan to provide an additional $300 million to the military over the next 10 years.
The AFC argues that the increase, averaging $30 million a year over the period, falls well short of meeting the force’s daily core operating and procurement needs.

And one party spokesman warns that if the cutbacks go through as proposed, Sweden’s Air Force will shrink below Norway’s.

That country’s Air Force has 46 F-16s, which are to be complemented and eventually replaced by 52 F-35 joint strike fighters.

“Sweden has changed from being the Nordic region’s foremost military power, with the biggest Air Force and defense budget, to now lagging behind Norway in terms of spending.

Norway will also soon have a bigger Air Force,” Peter Rådberg, the Green Party’s defense spokesman, told Defense News.

“What we have is a defense starved of funding and which is walking on crutches. If the military is forced to carry a major share of the cost of a new JAS Gripen project, it will crash.”
November 2024 update at FokkerNews.nl....
hammarö
Scramble Addict
Scramble Addict
Posts: 1591
Joined: 19 Jun 2012, 10:30
Type of spotter: I am not Dutch fluent.
Subscriber Scramble: hammarö

Re: Sweden may buy 40-60 Saab 39E Gripen NGs after Swiss ord

Post by hammarö »

The Swedish government with prime minister Fredrik Reinfelt (Right Party) coalition has no majority. They had to negotiate with the Social Democrats. One other possibility is the Swedish Democrats (Sverige Deomkraterna) is difficult because of inner turmoils. He are also on the third defence minister. The first resigned because of the to heavy budget pressure of the defence. The second were sacked because of the Saudi affair. The last one are new and not strong in position,

The Swedish News TV1/TV2 today intervjued the Social Democrats who say that further 5 billions SEK for JAS Gripen has to be covered. It needs a rebalancing of the defence budget for Army, Navy and Air Force.

The result became how many JAS Gripen could be built.
Post Reply