RNLAF C-130 Hercules - G-988

ImageForum for news and discussions on miltary aviation matters.

Forum rules
Image
User avatar
Stafsels
Scramble Die-Hard
Scramble Die-Hard
Posts: 792
Joined: 24 Sep 2002, 09:28
Location: Near Breda

Re: RNLAF C-130 Hercules - G-988

Post by Stafsels »

And the Alouette III in desert pink.... :lol:
Fulcrum1974
Scramble Senior
Scramble Senior
Posts: 267
Joined: 12 Jan 2007, 18:23
Location: Lopik

Re: RNLAF C-130 Hercules - G-988

Post by Fulcrum1974 »

I now can confirm that the S453 will be painted grey as well.
User avatar
Mark B.
Scramble Senior
Scramble Senior
Posts: 320
Joined: 28 Oct 2008, 08:40
Type of spotter: photo only
Subscriber Scramble: Mark Broekhans
Location: Hierden

Re: RNLAF C-130 Hercules - G-988

Post by Mark B. »

Just read that, once again, there will be a delay in the delivery of the first C-130. Trouble with "metal parts surrounding the engines" are the main reason. Delivery is now expected early 2010.

Still looks a lot better than DC-10 T-255. This aircraft arrived october 25th 2004 (at Eindhoven) and is still not in operational use (besides some training flights and an occasional trip to support Dutch troops). Early 2010 is the new target and then only in full freighter configuration.........
aviodromefriend
Scramble Master
Scramble Master
Posts: 3523
Joined: 03 Dec 2006, 22:10
Type of spotter: zo snel afgekeurd, ik kreeg geen kans S5 te worden
Location: Airshows, EHKD, Where HAT eh took me

Re: RNLAF C-130 Hercules - G-988

Post by aviodromefriend »

Mark B. wrote:Still looks a lot better than DC-10 T-255. This aircraft arrived october 25th 2004 (at Eindhoven) and is still not in operational use (besides some training flights and an occasional trip to support Dutch troops). Early 2010 is the new target and then only in full freighter configuration.........
Wow! AFAIK the conversion to freighter was cancelled some 2,5 years ago, due to a lack of money. It should enter service in full-pax configuration, and remain so during its RNLAF career.
De Zamboni heeft kramp in zijn achterwiel
Jan Maarten Smeets, Heerenveen 31 oktober 2009
User avatar
Rockville
Scramble Addict
Scramble Addict
Posts: 1648
Joined: 24 Nov 2007, 00:38

Re: RNLAF C-130 Hercules - G-988

Post by Rockville »

Mark B. wrote:Just read that, once again, there will be a delay in the delivery of the first C-130. Trouble with "metal parts surrounding the engines" are the main reason. Delivery is now expected early 2010. Still looks a lot better than DC-10 T-255. This aircraft arrived october 25th 2004 (at Eindhoven) and is still not in operational use (besides some training flights and an occasional trip to support Dutch troops). Early 2010 is the new target and then only in full freighter configuration.........
All the info about the delays in delivery are stated in a letter sent to the Dutch Parlement. The letter is in Dutch.
User avatar
frank kramer
Scramble Master
Scramble Master
Posts: 4660
Joined: 28 Jun 2003, 21:58
Subscriber Scramble: frank kramer
Location: het kan in Almere

Re: RNLAF C-130 Hercules - G-988

Post by frank kramer »

Quoting from the letter sent to the Dutch Parliament by Defence Procurement Secretary Jack de Vries:

Delays were also mentioned for the new Chinooks on order, the first one not being expected before the last quarter of 2010. Reasons for delays with Chinooks and DC-10 are given as "software problems". Software problems also cause additional delay with the Hercules. Dutch Defence Secretary also stated that a decision on whether to modify the DC-10 for carrying (military) pax -even though it was initially delivered to the RNLAF as a (civil) pax aircraft- is delayed pending the outcome of further analysis of the steps that need to be taken (to get approval by the Military Airworthiness Authority). This is expected towards the end of the first quarter of 2010. If the "go ahead" is given, the aircraft will be modified (and taken out of service for several months to complete the makeover).

Interesting from another point of view is that -of the six new Chinooks on order- only three will initially be based at Gilze-Rijen. The other three will be delivered to a US Army base in the CONUS for training purposes. At present, selection procedure for this base is apparently under way with three options open. No names given, though.
Frank Kramer

Always going forward... still can't find reverse!
User avatar
Mark B.
Scramble Senior
Scramble Senior
Posts: 320
Joined: 28 Oct 2008, 08:40
Type of spotter: photo only
Subscriber Scramble: Mark Broekhans
Location: Hierden

Re: RNLAF C-130 Hercules - G-988

Post by Mark B. »

aviodromefriend wrote:
Mark B. wrote:Still looks a lot better than DC-10 T-255. This aircraft arrived october 25th 2004 (at Eindhoven) and is still not in operational use (besides some training flights and an occasional trip to support Dutch troops). Early 2010 is the new target and then only in full freighter configuration.........
Wow! AFAIK the conversion to freighter was cancelled some 2,5 years ago, due to a lack of money. It should enter service in full-pax configuration, and remain so during its RNLAF career.
Well, things have changed a lot but still it looks like a never ending story regarding this DC-10. I remember the day I boarded this aircraft shortly after delivery at Eindhoven. It was in full pax configuration and looked like the last passengers just left the aircraft. The next time I was inside, just after the respray, it was just an empty space and I think not much has changed since then (besides the cockpit off course). The full pax configuration, with an easy palletized seat system, was a serious option, there is a even a new building built for this purpose. But now it looks like this will remain an empty space...

Nevertheless, early 2010 we will finally see a lot of "new" aircraft for 334/336 sqn.

Mark
Post Reply

Return to “Military Aviation News”