F-35 Lightning II developments
Forum rules
- Mark B.
- Scramble Senior
- Posts: 320
- Joined: 28 Oct 2008, 08:40
- Type of spotter: photo only
- Subscriber Scramble: Mark Broekhans
- Location: Hierden
Re: F-35 Lightning II developments
Is there anyone who can confirm that AN-9, the first Italian build RNLAF F-35 and future F-009, already made its first flight last month (July)?
I read something about it a few weeks ago but cannot find this item anymore.
Mark
I read something about it a few weeks ago but cannot find this item anymore.
Mark
Re: F-35 Lightning II developments
930. For now. FMS 17-5328.Bjorn wrote:Any serial?gluefan1 wrote:Aug 22, AS-20 first flight
https://www.facebook.com/TXAFTERBURNER/ ... 274689736/
Greets,
- Starfighter_F-104G
- Scramble Addict
- Posts: 1271
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
Mark B. wrote:Is there anyone who can confirm that AN-9, the first Italian build RNLAF F-35 and future F-009, already made its first flight last month (July)?
I read something about it a few weeks ago but cannot find this item anymore.
Mark
NEGATIVE
LIMN CLOSED due to WIP
Re: F-35 Lightning II developments
First flight expected in the first 2 weeks of septemberMark B. wrote:Is there anyone who can confirm that AN-9, the first Italian build RNLAF F-35 and future F-009, already made its first flight last month (July)?
I read something about it a few weeks ago but cannot find this item anymore.
Mark
- Coati
- Scramble Addict
- Posts: 1561
- Joined: 25 Jun 2005, 19:53
- Type of spotter: S5
- Subscriber Scramble: No
- Location: Meppel, Netherlands
Re: F-35 Lightning II developments
Hi Bjorn,Bjorn wrote:You're absolutely right. We'll find out in the near future I suppose.Melchior Timmers wrote:Than the series would run BF-71 to BF-88 (18 aircraft of the original LRIP 11).Bjorn wrote: As far as my info goes the CAP was not included in the regular LRIP XI production cycle.
Strange if they would add 4 out of 6 CAP aircraft in that series, up to BF-92, right?
Greets,
From all the information coming in regarding the total number of F-35s for LRIP-11, I noted:
24 F-35B (Marines)
12 F-35C (USN)
2 F-35C (USMC)
1 F-35B (UK)
From F-35.com:
LRIP 11 Aircraft Costs (including jet, engine and fee) are:
102 F-35As CTOL - $89.2 million (5.4% reduction from Lot 10)
25 F-35Bs STOVL - $115.5 million (5.7% reduction from Lot 10)
14 F-35Cs CV - $107.7 million (11.1% reduction from Lot 10)
https://www.f35.com/about/cost
25 F-35B corresponds with 24 USMC plus BK-18 for the RAF. I noted BL-03 as Lot-12, not for LRIP-11.
The 14 F-35C matches the 12 USN plus 2 USMC.
create your own database with www.spottingmode.com
- Melchior Timmers
- Scramble Addict
- Posts: 1589
- Joined: 13 May 2006, 18:06
- Subscriber Scramble: Melchior Timmers
- Location: Soest
- Contact:
Re: F-35 Lightning II developments
I think BK-18 is 169606, the first aircraft of LRIP 11 since that order was clear from the start.
F-35C 169640 is the last buno of LRIP 11, 169641 is a F/A-18E.
Edit: we just don’t know and have to wait.....
F-35C 169640 is the last buno of LRIP 11, 169641 is a F/A-18E.
Edit: we just don’t know and have to wait.....
Melchior Timmers
Editor Scramble Magazine
-----------------------------------------
PO Box 75545
1118 ZN Schiphol
The Netherlands
E-mail: melchior.timmers@scramble.nl
Internet: http://www.scramble.nl" onclick="window.open(this.href);return false;
Editor Scramble Magazine
-----------------------------------------
PO Box 75545
1118 ZN Schiphol
The Netherlands
E-mail: melchior.timmers@scramble.nl
Internet: http://www.scramble.nl" onclick="window.open(this.href);return false;
Re: F-35 Lightning II developments
Indeed. Because the previous list only gives a possible answer to the F-35B BuNo. But not for the F-35C and also not for the F-35A.Melchior Timmers wrote:I think BK-18 is 169606, the first aircraft of LRIP 11 since that order was clear from the start.
F-35C 169640 is the last buno of LRIP 11, 169641 is a F/A-18E.
Edit: we just don’t know and have to wait.....
So we'll see the coming months.
Greets,
Bjorn Claes
F-16.net editor/photo library admin/serials database admin
F-16.net editor/photo library admin/serials database admin
Re: F-35 Lightning II developments
AW-03 (18-003/15-5223) & AW-04 (18-004/15-5224) arrived Cheongju 21Aug19. This was followed by
AW-01 (18-001/15-5221) & AW-02 (18-002/15-5222) sometime during 22-25Aug19, bringing the total
to eight ROKAF F-35s delivered.
SD
AW-01 (18-001/15-5221) & AW-02 (18-002/15-5222) sometime during 22-25Aug19, bringing the total
to eight ROKAF F-35s delivered.
SD
- Starfighter_F-104G
- Scramble Addict
- Posts: 1271
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
First F-35 for Leeuwarden lands October 31
This is confirmed by a spokeswoman for the Royal Netherlands Air Force on request.
The F-009 is expected to land at Leeuwarden Air Base on 31 October.
The F-010 will be added later this year. The Air Force could not yet say when that will be exactly.
This is confirmed by a spokeswoman for the Royal Netherlands Air Force on request.
The F-009 is expected to land at Leeuwarden Air Base on 31 October.
The F-010 will be added later this year. The Air Force could not yet say when that will be exactly.
Re: F-35 Lightning II developments
F-010 should arrive one week laterStarfighter_F-104G wrote:First F-35 for Leeuwarden lands October 31
This is confirmed by a spokeswoman for the Royal Netherlands Air Force on request.
The F-009 is expected to land at Leeuwarden Air Base on 31 October.
The F-010 will be added later this year. The Air Force could not yet say when that will be exactly.
Re: F-35 Lightning II developments
From a reliable source, next delivery to RNoAF (presumably AM-20/21/22) will take place in mid-October.
SD
SD
Re: F-35 Lightning II developments
Roll out ceremony for the F-009 at Cameri is planned for thursday 12/9
- Starfighter_F-104G
- Scramble Addict
- Posts: 1271
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
roberto wrote:Roll out ceremony for the F-009 at Cameri is planned for thursday 12/9
F/F planned today
- Grappa01
- Scramble Newbie
- Posts: 31
- Joined: 29 Mar 2008, 19:42
- Subscriber Scramble: Grappa01
- Location: Cadrezzate (VA), Italy
Re: F-35 Lightning II developments
Take off should be at 1515 local time.
- Starfighter_F-104G
- Scramble Addict
- Posts: 1271
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no