...nog maar eens een paar eisen zoals die in documenten op
https://www.tenderned.nl/tenderned-web/ ... 5BFB.node4
staan:
3. The winning Tenderer shall convert the Aircraft in accordance with the terms of the Agreement into the Converted Aircraft which is fully compliant with the Delivery Conditions on the Scheduled Delivery Date;
A review of the needs, expectations and constraints of the State of the Netherlands has led to the following, as further detailed and expanded in Schedule 8 (Requirements, Additional Requirements and Concept Conversion Specification) to the Agreement and in Appendix C (Sub Award Criteria and scoring method) to this Request for Proposal:
o The Converted Aircraft shall have an economic life of at least 20 years as the Converted Aircraft is expected to be used for at least 20 years following the Delivery Date;
o The Converted Aircraft shall be able to accommodate 24 passengers, 3 flight crew and 3 cabin attendants and 1 flight engineer with their luggage. The cabin configuration of the Converted Aircraft shall be customized to the needs of the State of the Netherlands as set out in the Concept Conversion Specification included as Part C of Schedule 8 (Requirements, Additional Requirements and Concept Conversion Specification) to the Agreement;
o The Converted Aircraft shall have long haul range capabilities and in particular a range sufficient to carry 12 passengers, 3 flight crew and 3 cabin attendants and 1 flight engineer with their luggage from Amsterdam to Aruba without refuelling;
o The Converted Aircraft is expected to be operated from airports which runway length does not exceed 1,700 meters;
o The Converted Aircraft shall have sufficiently low CO2 and NOx emissions and noise at least at CAEP/4 levels;
o The Converted Aircraft shall be operating cost efficiently;
o The Converted Aircraft is expected to be incepted into operation no later than 1 November 2018;
De data hieronder zullen nu wel wat verschoven zijn verder in de tijd, maar per 13 juli 2016 was dit het oorspronkelijke schema:
Timetable
The table below reflects the timetable for the Tender Procedure. The timetable is indicative and Tenderers cannot derive any rights from it. The Contracting Authority reserves the right to adjust the timetable.
Activity
Date
Publication of Announcement through TenderNed
13 July 2016
Submission of first round of Q&A Requests (no later than)
15 September 2016
Publication of first Information Memorandum
30 September 2016
Submission of second round of Q&A Requests (no later than)
5 October 2016
Publication of second Information Memorandum
31 October 2016
Deadline for submission of Tenders
30 November 2016, 12.00 hrs local time
Appointment of Preferred Tenderer
15 December 2016
Suspensive period (20 calendar days)
16 December 2016 – 4 January 2017
Pre-purchase inspection
week starting 5 January 2017
Announcement of award
30 January 2017
Anticipated Agreement Execution Date
1 February 2017